Maes Y Fynnon, St Asaph
Home > Residential > Ongoing Projects > Maes Y Fynnon, St Asaph
A development of 28 one, two and three bedroom houses in timber frame construction.
Foundations are Augured pile incorporating a housedeck system.
Designed to EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted to each house.
The client is a registered Social Landlord.
Commenced in February 2026, Slated for completion August 2027.
- Big concrete cylinder blocks on a building site with houses in the background
- The entrance to te building side from the main road in Maes y Fynnon in St Asaph
- The variety of materials that will be used to build houses in Maes y Fynnon in St Asaph
- A worker using a level to see measure the ground of the building site
- The ground of the building side after workers have worked on it
- Close view of rocks and being picked up by a digger on the building site
- Close view of rocks and mud being picked up by a digger on the building site
- A person inside the digger picking gravel on the building site
- Aerial view of the building site in Maes y Fynnon in St Asaph
- Aerial View of the area Castlemead are working on in Maes Y Fynnon in St Asaph
- Aerial view of the materails and work vehicles that will be used to build houses in Maes y Fynnon in St Asaph
- Aerial view of building materials in Maes y Fynnon in St Asaph
- Close view of gravel falling from the digger