A development of 9 two and three bedroom houses in timber frame construction.

Foundations are traditional strip footings incorporating a beam and insulation infill ground floor slab system to achieve greater U-Values

Designed to EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted to each house.

The client is a registered Social Landlord.

Commenced in April 2026, Slated for completion May 2027

  • Aerial view of housing development under construction.
  • Overhead view of active construction site.
  • Drone view of timber-framed homes under construction.
  • Mobile crane on construction site.
  • Scaffolded housing block under construction.
  • Timber roof trusses being installed.
  • Timber roof frame under construction.
  • Roof rafters being installed.
  • Internal timber wall framing.
  • Timber frame interior under construction.
  • The building side castlemead will be working on in Maes Twnti, Morfa Nefyn
  • Close view of the JCB digging the ground at Maes Twnti, Morfa Nefyn
  • Rear view of a person inside the JCB working on moving gravel in Maes Twnti, Morfa Nefyn
  • A person inside the digger digging the ground in Maes Twnti, Morfa Nefyn
  • View of the ground after been digged up and cemented
  • Close view of the level of ground they've digged up in Maes Twnti, Morfa Nefyn
  • Long view of a person inside a JCB moving gravel in Maes Twnti, Morfa Nefyn
  • Aerial view of the building side Castlemead are working on in Maes Twnti, Morfa Nefyn
  • Aerial view of the work Castlemead have done in Maes Twnti, Morfa Nefyn
  • Aeriel view of the work that's been done already by Castlemead in Maes Twnti, Morfa Nefyn


All projects