Glan Y Mor, Colwyn Bay.

Home > Residential > Ongoing Projects > Glan Y Mor, Colwyn Bay.

A development of 54 one and two bedroom apartments over five floors on a constrained town centre site. The scheme involves the demolition of existing Victorian properties and construction of the new apartment block in concrete and timber frame. The foundation system is a complex piled Raft system with concrete Lower and upper ground floors with a timber frame structure above. Designed to Achieve EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted for each apartment. The communal spaces feature roof terraces and a low level garden with Sustainable urban Drainage features. The client is a registered Social Landlord. Commenced in April 2024, Slated for completion January 2027.

  • skylight window being put in the roof
  • the roof being slated
  • piles of slates on the roof
  • slates piled on top of eachother on the roof
  • room with 2 windows and wood on the walls
  • hallway with wood framing
  • room deviders made with wood
  • wooden framing being put up in the building
  • inside of the building sites
  • scaffolding on the front of the building with a crane
  • castlemead logo hanging from scaffolding
  • scaffolding witht the castlemead logo on it
  • aerial view of the site
  • aerial view of the site with sea in the background
  • aerial view of the site


All projects