Maes Twnti, Morfa Nefyn
Home > Ongoing Projects > Maes Twnti, Morfa Nefyn
A development of 9 two and three bedroom houses in timber frame construction.
Foundations are traditional strip footings incorporating a beam and insulation infill ground floor slab system to achieve greater U-Values
Designed to EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted to each house.
The client is a registered Social Landlord.
Commenced in April 2026, Slated for completion May 2027
- The building side castlemead will be working on in Maes Twnti, Morfa Nefyn
- Close view of the JCB digging the ground at Maes Twnti, Morfa Nefyn
- A person insie a JCB moving gravel on the building side in Maes Twnti, Morfa Nefyn
- Rear view of a person inside the JCB working on moving gravel in Maes Twnti, Morfa Nefyn
- Close view of gravel being moved by a JCB on the building side in Maes Twnti, Morfa Nefyn
- View of the digger digging the ground in Maes Twnti, Morfa Nefyn
- A person inside the digger digging the ground in Maes Twnti, Morfa Nefyn
- View of the ground after been digged up and cemented
- View of the ground after been digged up, leveled and cemented
- Close view of the level of ground they've digged up in Maes Twnti, Morfa Nefyn
- Long view of a person inside a JCB moving gravel in Maes Twnti, Morfa Nefyn
- View of a person inside the JCB dropping gravel onto the ground
- Close view of the grappler on the jcb moving gravel in Maes Twnti, Morfa Nefyn
- Aerial view of the building side Castlemead are working on in Maes Twnti, Morfa Nefyn
- Aerial view of the site in Maes Twnti, Morfa Nefyn
- Aerial view of the building site and the surrounding area in Maes Twnti, Morfa Nefyn
- Aerial view of the work Castlemead have done in Maes Twnti, Morfa Nefyn
- Aeriel view of the work that's been done already by Castlemead in Maes Twnti, Morfa Nefyn

















