Glan Y Mor, Colwyn Bay.

Home > Ongoing Projects > Glan Y Mor, Colwyn Bay.

A development of 54 one and two bedroom apartments over five floors on a constrained town centre site. The scheme involves the demolition of existing Victorian properties and construction of the new apartment block in concrete and timber frame. The foundation system is a complex piled Raft system with concrete Lower and upper ground floors with a timber frame structure above. Designed to Achieve EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted for each apartment. The communal spaces feature roof terraces and a low level garden with Sustainable urban Drainage features. The client is a registered Social Landlord. Commenced in April 2024, Slated for completion January 2027.

  • arial view of the building site next to the sea
  • drone shot of the glan y mor site
  • drone shot of the colwyn bay site
  • wooden frames in the building site
  • drone shot of the machinery working on the site
  • long corridor made of wooden frames
  • inside of the glan y mor site
  • long corridor inside of the glan y mor site
  • black window with red film around it
  • large emoty room
  • scaffolding on the site
  • drone shot on the current building site
  • outside of the building site
  • aerial view of the site
  • outside wood work


All projects