Cae Cwm, Ruabon

Home > Ongoing Projects > Cae Cwm, Ruabon

A development of 43 one, two and three bedroom houses and bungalows in timber frame construction on a brownfield site adjacent to a former coal mine and tip. 

Site cut/fill, sheet pile retaining walls, piled raft slab foundations due to ground conditions. Designed to EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted to each house. The client is a registered Social Landlord. Commenced May 2024, slated for completion May 2026.

  • Ariel view of the Wynnstay Technology Park ground clearing
  • Ariel view of the Wynnstay Technology Park ground cleared
  • Ariel view of the Wynnstay Technology Park preparing the ground for foundations
  • DNT lorry being dilled by a digger
  • machinery working on the site
  • aerial view of the wynnstay site
  • orange hitachi digger on the site
  • containers and vehicled on the wynnstay contruction site
  • drone shot of the site
  • drone shot of the site with workera and machinery
  • a clear site overview of the progress made
  • From the air, a side view of someof our bungalows already built
  • Busy site with workers and vans at our Ruabon site
  • Crane and enterance to the Ruabon site
  • Solar panels beind placed at our Ruabon site.